Project Reference

A showcase of our proven expertise

We take pride in every project we've undertaken with clients. Each one reflects our dedication, advanced technology, and unwavering commitment to quality.

Humaster has successfully improved air conditioning system in storage room of National Palace Museum of Korea using innovative dehumidification and air conditioning technology.

By resolving energy consumption issues with temperature and humidity control, we have improved environment for these cultural heritage objects. The power consumption is reduced by 49.2%, by operating with the air conditioner.

National Palace Museum of Korea

Product name:

Humicon

No. of product used:

3

Project Duration:

2025.03.01

Dong-ah Institute of Media and Arts

Product name:

Humicon

No. of product used:

1

Project Duration:

2025.02.01

Youngwon Middle School

Product name:

Humicon

No. of product used:

4

Project Duration:

2025.02.01

Jinmal Elementary School

Product name:

Humicon

No. of product used:

1

Project Duration:

2025.02.01

Songdo High School

Product name:

Humicon

No. of product used:

2

Project Duration:

2025.02.01

Dasan High School

Product name:

Humicon

No. of product used:

21

Project Duration:

2024.12.01