Project Reference

A showcase of our proven expertise

We take pride in every project we've undertaken with clients. Each one reflects our dedication, advanced technology, and unwavering commitment to quality.

Humaster has successfully improved air conditioning system in storage room of National Palace Museum of Korea using innovative dehumidification and air conditioning technology.

By resolving energy consumption issues with temperature and humidity control, we have improved environment for these cultural heritage objects. The power consumption is reduced by 49.2%, by operating with the air conditioner.

Seoul Gangseo - Yangcheon District Office of Education

Product name:

Humicon

No. of product used:

4

Project Duration:

2024.10.01

KyungHee Global Campus

Product name:

Humicon

No. of product used:

4

Project Duration:

2024.09.01

Seungil Hope Nursing Hospital

Product name:

Humicon

No. of product used:

22

Project Duration:

2024.09.01

Hanbit Nuclear Power Plant

Product name:

Humicon

No. of product used:

2

Project Duration:

2024.08.01

Korea Housing Management

Product name:

Humicon

No. of product used:

2

Project Duration:

2024.08.01

Dehumidifying Sheet for Fire Detector

Product name:

Husheet

No. of product used:

0

Project Duration:

2024.07.01